Guide
Guide
Guide
Guide
Guide
Guide
Guide
Pile vs. Grade Beam: Choosing a Foundation for an Ontario Steel Building
The choice is made by the soil, not by preference. Here is how to read a geotechnical report for a steel building and what each foundation type costs you in schedule and risk.
Ontario Frost Depth and What It Does to Your Foundation Design
Frost depth sets the bottom of your foundation, and it varies more across Ontario than most site budgets assume. What drives it, and where soil matters more than latitude.
When the Ontario Building Code Requires Non-Combustible Construction
Non-combustible construction is a classification with thresholds, not a preference. Here is what drives the requirement for an Ontario industrial building and when it gets decided.
Pre-Engineered vs. Conventional Structural Steel: Cost, Span and Lead Time
Pre-engineered is usually cheaper and faster for a straightforward industrial envelope. Here is where that stops being true and conventional structural steel earns its premium.
IMP vs. Standing Seam vs. Single-Ply on a Low-Slope Industrial Roof
Three systems cover most Ontario industrial roofs. They differ on slope, insulation continuity, maintenance and what happens at every penetration.
What a Steel Building Supplier Does Not Include
A steel building quote covers the building. A project budget covers the project. The gap between them is the most common reason an industrial development runs over.
Expanding or Renovating an Existing Industrial Building in Ontario
Most industrial construction in Ontario is not a new building. It is a bay added to an existing one, a warehouse refitted for a new tenant, or a twenty-year-old envelope replaced. Here is what changes when the building is already there.
Ready to build?
Start Your Project Today
Contact Terrahills for a free, no-obligation Class C estimate on your industrial project anywhere in Ontario.
Get a Class C Estimate →