Lot Clearing & Grading
Site Servicing · Ontario

Lot Clearing & Grading

Back to Infrastructure & Site Servicing

Project Overview

A multi-parcel lot clearing and grading program across Ontario in 2020: tree and vegetation removal, topsoil stripped and stockpiled for reuse, finished grades established to the engineered design, and erosion and sediment controls installed from the first day to the last.

Grading is where a site's drainage is decided for the life of everything built on it. Terrahills ran the grading phase on GPS-guided equipment, which hits engineered elevations precisely on the first pass and removes the survey-and-recut cycle that adds cost and time to conventional grading.

Environmental compliance ran alongside the earthworks rather than after: silt fence and sediment controls, stabilized construction entrances, protection of adjacent land and watercourses, and a documented compliance record, so the parcels were handed over ready for construction with no drainage problems and nothing for a conservation authority to find.

The program was scheduled around Ontario's weather: clearing and stripping in the windows the season allowed, grading sequenced to keep crews productive through wet periods, and topsoil placement timed for stabilization.

The Challenge

Clearing and precisely grading multiple parcels while managing environmental compliance, drainage design, topsoil preservation and seasonal weather constraints across Ontario sites.

Our Solution

A systematic clearing and grading program with GPS-guided equipment and real-time survey control, sediment management installed and maintained throughout, topsoil stockpiled for reuse, and flexible scheduling that kept crews productive through the available weather windows.

Site ServicingLot ClearingGradingGPS-Guided GradingErosion & Sediment ControlOntarioSite Preparation
Lot clearing and grading program — specification
ItemSpecification
ScopeLot clearing, grading and regrading across multiple Ontario parcels, 2020
ClearingTree and vegetation removal; topsoil stripped and stockpiled for reuse
GradingFinished grades to engineered design on GPS-guided equipment with real-time survey control
EnvironmentalSilt fence and sediment controls, stabilized entrances, watercourse protection, documented throughout
DrainageGrades established to the engineered drainage design before any construction
SchedulingSequenced to Ontario weather windows; crews kept productive through wet periods
HandoverConstruction-ready parcels with a clean compliance record

Program-level figures; parcel counts and volumes varied by site.